GEOGRAPHY

The main projects that the specialists of ALNSTROY, LLC worked on
KUWAIT
TANZANIA
TURKEY
SAINT PETERSBURG
NOVOSIBIRSK
UFA

UFA, RUSSIA

On March 21, 2024, the grand opening of the "Eastern Exit" from Ufa to the federal highway M-5 "Ural" took place.
The Eastern exit is one of the largest infrastructure projects of the Republic of Bashkortostan, thanks to which it will be possible to get from Ufa to the M-5 Ural highway in 10 minutes.
The specialists of ALNSTROY, LLC participated in the implementation of the bridge project, which is being built using the sliding method.

М-5 "Ural"

The project of building a highway through the rock to the bridge was started back in Soviet times, but in the process it was abandoned due to the high cost, and for 25 years the project was frozen, even without passage. Due to the lack of bypass roads and the successful development of the region, the restoration of this project was necessary.

The eastern exit is a 1.2 km long road tunnel, a bridge crossing with an overpass over the Ufa River with a length of 2.7 km and a 10 km expressway. The total length is 13.9 km. The estimated speed of vehicles will be 120 km/h, in the tunnel – 80 km/h. With the commissioning of the exit, car owners will be able to get from the center of Ufa to the M-5 in ten minutes.


SAINT-PETERSBURG,
RUSSIA

NORTHWEST HIGH-SPEED DIAMETER
2012-2015

THE PROJECT OF THE CONSTRUCTION OF THE PETROVSKY CABLE-STAYED BRIDGE WITH A SPAN OF 580 M IN THE MALAYA NEVA BY THE SLIDING METHOD

The length of the central section is 11.7 km
Project cost 212.7 billion rubles

KUWAIT CITY,
KUWAIT

CONSTRUCTION OF A NEW INTERNATIONAL AIRPORT
2016-2019

THE UNIQUENESS OF THE OBJECT IS THE ROOF OF THE TERMINAL WITH A HEIGHT OF UP TO 25 METERS.

TO IMPLEMENT IT, IT WAS IMPORTANT TO BUILD AND INSTALL SEVERAL HUNDRED PIECES OF PREFABRICATED BEAMS AS CONNECTING BRIDGES
OF THE BUILDING

About the project
The project cost is 3.7 Billion EUR
• Terminal have a total floor area of 708,000 m2 under a single roof.
• Terminal Building with basement, ground plus two floors
• 28 Terminal Gates, including 8 Gates for Airbus A380
• Transit Hotel with capacity for 400 beds
• The airport will initially accommodate 13 million passengers per year,
• The terminal has a trefoil plan, comprising three symmetrical wings of departure gates.

REPUBLIC OF TANZANIA,
DODOMA

CONSTRUCTION OF THE DARUSSALAM-MOROGORO – DODOMA-MAKUTUPORA RAILWAY, THE FIRST HIGH-SPEED TRAIN LINE IN EAST AFRICA 2018-2019.

PHOTO – CONSTRUCTION OF RAILWAY BRIDGES
ON A ROAD SECTION, 180 KM LONG.

THE COST OF THE PROJECT IS 2.2 BILLION US DOLLARS.
A RAILWAY LINE WITH A TOTAL LENGTH OF 2,561 KM.

NOVOSIBIRSK,
RUSSIA

CONSTRUCTION OF THE BRIDGE OVER THE "OB" RIVER
2017 – 2023.

PROJECT COST
44.7 BILLION RUBLES
THE TOTAL LENGTH IS 5.1 KILOMETERS

THE BRIDGE, NAMED "CENTRAL", WILL CONNECT THE SOUTHERN SQUARE WITH THE LABOR SQUARE AND WILL RUN PARALLEL TO THE EXISTING RAILWAY CROSSING. IT WILL PROVIDE ACCESS TO THE FEDERAL HIGHWAYS "BAIKAL", "CHUYSKY TRACT" AND "SIBERIA". THE CONSTRUCTION OF A NEW BRIDGE WILL ALLOW THE RECONSTRUCTION OF EXISTING ONES.
Contact us:
Tel: +7(921)744-13-35
E-mail: Info@alnstroy.com
Address: Prospekt Bakunina, 5, office №323, Saint-Petersburg, Russian Federation, 191024
Mn-Fr: 09:00−18:00

Общество с ограниченной ответственностью "АЛНСТРОЙ"
info@alnstroy.com
This site was made on Tilda — a website builder that helps to create a website without any code
Create a website