The project cost is 3.7 Billion EUR
• Terminal have a total floor area of 708,000 m2 under a single roof.
• Terminal Building with basement, ground plus two floors
• 28 Terminal Gates, including 8 Gates for Airbus A380
• Transit Hotel with capacity for 400 beds
• The airport will initially accommodate 13 million passengers per year,
• The terminal has a trefoil plan, comprising three symmetrical wings of departure gates.